
The scope of the project is to design a new API production building within the existing site. The new building will have to accommodate three productive suites, with the possibility to increase them to five.
Provided byTechniconsultSectorPharmaceuticalsFacilityBulk APIServicesBasic Design, Detail Design for permitting activitiesCountrySwitzerlandInvestment€ 50 MLN